Skip to main content

Table 4 Eigenvector loadings

From: Public private partnerships and water and sanitation infrastructure development in Zimbabwe: what determines financing?

Variable

PC 1

PC 2

PC 3

PC 4

PC 5

PC 6

CC

0.4367

−0.1252

0.2781

0.4583

−0.4453

−0.5549

RQ

0.4379

−0.1618

0.0490

−0.2177

−0.5428

0.6615

RL

0.4376

−0.0919

−0.1895

−0.7439

0.1224

−0.4425

VA

0.4256

−0.0213

−0.7539

0.4202

0.2476

0.1103

PS

0.2465

0.9633

0.0936

−0.0220

−0.0326

0.0316

GE

0.4291

−0.1460

0.5542

0.1101

0.6555

0.2134

  1. control of corruption (CC), regulatory quality (RQ), rule of law (RL), voice and accountability (VA) political stability (PS) and government effectiveness (GE)