Issues | Cost (in BDT) for laboratory assessment | Cost (in BDT) for SHC preparation |
---|---|---|
Transportation | 1000 | 500 |
Field equipments total cost (rent) | 550 | 550 |
Sampling bag and plastic sheet | 150 | N/A |
Lab test (chemical) | 1700 | N/A |
Lab test (physical) | 500 | N/A |
Team organizations with farmers and others (3 members) | N/A | 600 |
Total cost | 3900 (49.29 US $) | 1650 (20.85 US $) |