Electricity demand (103GWh) | |||
---|---|---|---|
Level | Low | Medium | High |
Probability | 0.2 | 0.6 | 0.2 |
t = 1 | [486, 600] | [526.5, 650] | [567, 700] |
t = 2 | [445.5, 550] | [486, 600] | [526.5, 650] |
t = 3 | [445.5, 550] | [486, 600] | [526.5, 650] |
t = 4 | [486, 600] | [526.5, 650] | [567, 700] |
t = 5 | [486, 600] | [526.5, 650] | [567, 700] |
t = 6 | [526.5, 650] | [567, 700] | [607.5, 750] |
t = 7 | [567, 650] | [607.5, 700] | [648, 750] |
t = 8 | [567, 650] | [607.5, 700] | [648, 750] |
t = 9 | [500, 600] | [607.5, 650] | [648, 700] |
t = 10 | [445.5, 550] | [486, 600] | [526.5, 650] |
t = 11 | [445.5, 550] | [486, 600] | [526.5, 650] |
t = 12 | [469.8, 580] | [510.3, 630] | [550.8, 680] |