Skip to main content

Table 5 Numeric values of the parameters used in the linear optimization model

From: A simulation-optimization approach for assessing optimal wastewater load allocation schemes in the Three Gorges Reservoir, China

Discharge outlet γ iCOD [m2/(kg/d)] γ iN H 4 + N [m2/(kg/d)] β iCOD [kg/m3] β iN H 4 + N [kg/m3] Q _ COD[kg/d] Q _ N H 4 + N [kg/d] Q _ WW[m3/d]
Sichuan Vinylon 10.11 25.94 0.11 0.005 6959 316 63260.27
Changshou Chemical #1 8.07 20.36 0.158 0.045 1927 551 12196.16
Changshou Chemical #2 14.14 36.88 0.158 0.085 628 338 3972.6
Changshou Chemical #3 12.73 38.76 0.158 0.078 1372 677 8680.55
Changshou Drainage 10.87 24.68 0.06 0.005 1200 100 20000
Yudong Oil and Fat 11.03 23.68 0.158 0.085 1225 82 7753.42
Hengliangzi Drainage 9.62 24.69 0.05 0.005 2055 205 41095.89
Fuling Chemical Plant 5.65 14.44 0.8 0.126 7778 1399 652.05
Taiji Pharmaceutical Factory 11.09 26.60 0.215 0.028 562 15 1369.86
Jindi Industrial Group 11.14 28.63 0.354 0.064 522 68 21945.21
Chuandong shipyard 11.08 19.18 0.56 0.015 295 38 1002.74