From: Watershed modeling using arc hydro based on DEMs: a case study in Jackpine watershed
 | Network length (km) | Number of streams | Catchment area (km2) | Number of catchments |
---|---|---|---|---|
Original stream | 2082.4 | 5054 | 1868.2 | - |
Simulation A | 565.1 | 148 | 1728.4 | 148 |
Simulation B | 648.1 | 155 | 1744.2 | 155 |
Simulation C | 1758.2 | 1374 | 1803.4 | 1374 |