From: Robust interval quadratic programming and its application to waste management under uncertainty
Residue generation rate when waste is shipped from district to incinerator | [0.25, 0.30] |
Residue generation rate when waste is shipped from TR to incinerator | [0.12, 0.15] |
Density factor for waste disposed of at landfill (m3/t) | [1.47, 1.82] |
Volume of the existing landfill (103 m3) | [76, 80] |
Daily landfill capacity (t/day) | [1950, 2020] |
Daily incinerator capacity (t/day) | [[440, 470], [490, 520]] |
Safety coefficient for incinerator | [[0.09, 0.13], [0.17, 0.21]] |
Electricity-generation rate when waste is shipped from district to incinerator (KWh/t) | [280, 300] |
Electricity-generation rate when waste is shipped from TR to incinerator (KWh/t) | [370, 400] |
Material recycling rate at TR | [0.16, 0.20] |
Mass loss rate at TR | [0.22, 0.25] |
Maximum expansion capacity for landfill (106 m3) | 18 |
Maximum expansion capacity once time for incinerator (t/day) | 250 |
Maximum expansion capacity once time for transfer station (t/day) | 600 |