Electricity generation facilities | η i (106kg/PJ) | CCS | F ij | λ ij | r ij | Cost of installmentCIN it ($106/GW) | Cost of operationCOP it ($106/PJ) | ||||
---|---|---|---|---|---|---|---|---|---|---|---|
t = 1 | t = 2 | t = 3 | t = 1 | t = 2 | t = 3 | ||||||
PC (i = 1) | [38, 40] | j = 1 | 1 | [0, 0] | [0.85, 0.90] | [20, 25] | [22, 27] | [25, 28] | [9, 13] | [10, 14] | [11, 16] |
j = 2 | 0 | – | – | – | – | – | – | – | – | ||
j = 3 | 1 | [0.08, 0.1] | [0.90, 1.00] | [55, 60] | [58, 63] | [60, 68] | [10, 14] | [11, 15] | [11, 17] | ||
NGCC (i = 2) | [22, 25] | j = 1 | 1 | [0, 0] | [0.85, 0.90] | [22, 28] | [25, 30] | [27, 32] | [7, 10] | [9, 13] | [11, 15] |
j = 2 | 1 | [0.05, 0.08] | [0.88, 0.93] | [30, 35] | [32, 37] | [35, 40] | [8, 11] | [11,14] | [12, 17] | ||
j = 3 | 1 | [0.07, 0.09] | [0.90, 1.00] | [28, 33] | [30, 35] | [32, 38] | [7, 11] | [10,14] | [12, 17] | ||
IGCC (i = 3) | [31, 34] | j = 1 | 1 | [0, 0] | [0.85, 0.90] | [22, 27] | [25,30] | [28, 33] | [10, 14] | [12, 16] | [14, 18] |
j = 2 | 1 | [0.09, 0.11] | [0.90, 0.95] | [42, 47] | [45, 49] | [48, 50] | [11, 15] | [12, 16] | [15, 19] | ||
j = 3 | 1 | [0.08, 0.10] | [0.90, 1.00] | [45, 50] | [48, 53] | [51, 56] | [12, 16] | [13, 17] | [15, 19] |