Electricity generation facilities | Cost of electricity generationCEG it ($106/PJ) | Cost of capacity expansionCCE it ($106/GW) | ||||
---|---|---|---|---|---|---|
t = 1 | t = 2 | t = 3 | t = 1 | t = 2 | t = 3 | |
PC (i = 1) | [2.5, 2.8] | [3.0, 3.2] | [4.0, 4.3] | [850, 900] | [880, 920] | [860, 910] |
NGCC (i = 2) | [5.5, 5.7] | [6.5, 6.8] | [7.5, 7.8] | [720, 750] | [780, 810] | [760, 800] |
IGCC (i = 3) | [3.5, 3.9] | [4.5, 5.0] | [5.0, 5.5] | [1000, 1050] | [1100, 1170] | [1150, 1200] |
Hydro power (i = 4) | [1.5, 1.8] | [1.7, 2.0] | [1.8, 2.1] | [1100, 1150] | [1150, 1190] | [1200, 1240] |
Wind power (i = 5) | [0.5, 0.7] | [0.6, 0.9] | [0.8, 1.2] | [1800, 1860] | [1900, 1950] | [1950, 2000] |